Staff Engineer dan Metode
PT. Amarta Karya (Persero)
Jan 2018 - Apr 2020
Bandar Udara Internasional I Gusti Ngurah Rai, BaliBandar Udara Internasional I Gusti Ngurah Rai, Bali
Proyek Design and Build Gedung VVIP, Base Ops TNI, dan Penggantian Line Maintenance Airlines di Bandar Udara Internasional I Gusti Ngurah Rai Bali.
My job responsibilities are:
1). Create a Planning Progress Report periodically for invoices document to project owners
2). Create and arrange work methods with the construction manager
3). Create 3D buildings for internal meetings with Sub Contractors / Foreman and project owners
4). Checking Shop Drawing and As-Built Drawing